973.509.7277
  • Corporate

    The Cleveland Browns’ $5 million, four-month renovation project vastly improves its Training and Administrative Complex in Berea, Ohio. The renovations are designed by the nationally recognized, integrated architecture, engineering, and technology design firm Westlake Reed Leskosky of Cleveland, Ohio, and recently recognized with an AIA Ohio 2014 Honor Award. The new workplace is a thoroughly modern space, respectful of the history and tradition of the Cleveland Browns yet forging a progressive identity for the team, via bold imagery, messaging, team branding and colors. Photography by Kevin G. Reeves.

    Related ArticleMore
  • Healthcare

    Designed by HOK, the new Prebys Cardiovascular Institute in La Jolla, Calif., is conceived to be the region’s largest and most advanced center dedicated to cardiovascular care. Interior spaces support advanced medical treatment, patient care, research, clinical trials and graduate medical education. The seven-story, 167-bed hospital includes 59 intensive care beds, four operating rooms, two hybrid operating rooms, three cardiac catheterization labs and an electrophysiology lab connected to centralized research labs, and a center for graduate education. Stephen Whalen Photography

    Related ArticleMore
  • Government

    The Wayne N. Aspinall Federal Building and U.S. Courthouse in Grand Junction, Colorado, received partial modernization and a high-performing green building renovation by the U. S. General Services Administration, Rocky Mountain Region. The Design-Build Partners were The Beck Group, as Design-Build Contractor and Architect-of-Record; and Westlake Reed Leskosky, was the Lead Design Architect, Integrated Engineer, Sustainable Design and Historic Preservation Consultant. Photography by Kevin G. Reeves.

    More

Corporate

The McMorrow Corporate Facilities Management Report presents news, information, feature articles, conferences, and products and services for commercial/corporate facility executives and administrators, property managers, and specifiers including architects, designers, and engineers charged with maintaining the workplace for optimal productivity, functionality, and retention of the workplace professional.

The McMorrow Corporate Facilities Management Report presents news, information, feature articles, conferences, and products and services for commercial/corporate facility executives and administrators, property managers, and specifiers including architects, designers, and engineers charged with maintaining the workplace for optimal productivity, functionality, and retention of the workplace professional.

Healthcare

The McMorrow Corporate Facilities Management Report presents news, information, feature articles, conferences, and products and services for commercial/corporate facility executives and administrators, property managers, and specifiers including architects, designers, and engineers charged with maintaining the workplace for optimal productivity, functionality, and retention of the workplace professional.

Government

The McMorrow Corporate Facilities Management Report presents news, information, feature articles, conferences, and products and services for commercial/corporate facility executives and administrators, property managers, and specifiers including architects, designers, and engineers charged with maintaining the workplace for optimal productivity, functionality, and retention of the workplace professional.

Sustainable

The McMorrow Corporate Facilities Management Report presents news, information, feature articles, conferences, and products and services for commercial/corporate facility executives and administrators, property managers, and specifiers including architects, designers, and engineers charged with maintaining the workplace for optimal productivity, functionality, and retention of the workplace professional.

Posts Tagged "R-Mer Force"

Garland’s flashless edge metal system saves time, money

Garland’s flashless edge metal system saves time, money

Garland’s new, flashless metal edge system eliminates the need for flashing plies that would ordinarily be installed at the roof’s edge, saving time during installation and costs on labor and material. R-Mer Force has completely re-engineered the way flashing is…

Read More